Skip to content
Surrey Tiling & Bathrooms home
The journal

Building Regs and Permission for a New Bathroom

Glen Hughes

Building Regs and Permission for a New Bathroom

Refurbishing a bathroom inside a house in England doesn't usually need planning permission. Building Regulations still apply, though: electrical work near the bath or shower is notifiable under Part P, new extractor fans must meet Part F, and new or altered drainage falls under Part H. Listed buildings and flats bring extra permissions. Here's what applies, and when.

Planning permission

Changing the inside of a house -- replacing a suite, retiling, moving fittings around -- isn't development that needs planning permission. The exceptions are:

  • Listed buildings. Internal alterations can need listed building consent, even with no change outside. Check with your council's conservation officer before work starts.
  • External changes in a conservation area, such as a new soil pipe on the front of the house or a new roof window for a loft bathroom.
  • Extensions built to house a new bathroom, which follow the normal rules for extensions.

Around our area that means Mole Valley District Council (Dorking, Leatherhead, Betchworth, Box Hill), Reigate and Banstead (Reigate, Redhill), Guildford Borough Council and Horsham District Council.

Building Regulations: what applies to a bathroom

Electrics (Part P)

All electrical work in a home must be safe, whether it's notifiable or not. In England, work is notifiable if it adds a new circuit, replaces the consumer unit, or alters a circuit within the "special location" around a bath or shower -- broadly, within 0.6m of the bath or shower tray and up to 2.25m high (Approved Document P). Notifiable work is either done by an electrician registered with a competent person scheme, who self-certifies it, or notified to building control. Either way, you should get a certificate.

Ventilation (Part F)

A bathroom needs extract ventilation to the outside. Approved Document F sets 15 litres per second for an intermittent extractor fan, or 8 litres per second for continuous extract. Replacing a fan like for like isn't usually notifiable, but a new bathroom or en-suite must meet the standard.

Drainage (Part H)

New connections to the soil stack, moved toilets and new soil vent pipes are covered by Part H. The rules cover falls, access for clearing blockages and how the system is vented. A brand-new bathroom or en-suite, or moving a toilet to a new connection, normally needs building control involvement. Swapping a suite in the same positions doesn't.

Hot water and sanitation (Part G)

Part G covers safe hot water and water efficiency. For most refurbishments its main effect is on new dwellings and conversions, but if you're adding a new bathroom, it's worth checking the hot water system can supply it safely.

Structure (Part A)

Cutting or strengthening floor joists, removing a wall, or putting a heavy bath or wet room on an upstairs floor can involve structural work. Joists can only be notched and drilled within set limits, and structural alterations need building control approval. See can you have a wet room upstairs?

Flats and leasehold

If you own a flat, your lease may require the freeholder's or managing agent's consent before alterations -- particularly plumbing changes, wet rooms and new flooring, because they affect the flat below. Approval can take weeks, so ask early.

Who arranges it?

On a full refurbishment, your installer should tell you at the quote stage what's notifiable and how it will be handled: self-certified electrical work, building control notifications for drainage or structural changes, and the certificates you'll receive at handover. If a quote doesn't mention any of this for a job that clearly involves it, ask. Keep the certificates -- buyers' solicitors ask for them when you sell.

Bathroom regulations FAQs

Do I need building regs to replace a bathroom like for like?

Usually not for the suite itself. Replacing a toilet, basin and bath in the same positions using existing connections isn't normally notifiable. Electrical work near the bath or shower, a new circuit or a new extractor may be, and all work must still be safe and meet the standards.

Do I need building regs to move a toilet?

Often, yes. Moving a toilet usually means a new connection to the soil stack or new drainage, which falls under Part H. Your installer or building control can confirm whether your specific change needs a notification. Moving the toilet a short distance on the same connection is less likely to need it than a new branch to the stack.

What happens if work wasn't certified?

It can cause problems when you sell, because buyers' solicitors ask for certificates for notifiable work. Councils can issue regularisation certificates for work done without approval, but it can mean opening up finished work for inspection. It's far easier to get it right at the time.

Planning a new bathroom or en-suite? We'll tell you at the home visit what's notifiable on your project and how it will be handled. See our bathroom refurbishment and en-suite services, or ask for a free home visit.

Your vision, our expertise

Inspired to start your own project?

Book a free consultation and we'll talk through ideas, materials and budget for your space.